Byk Epoxy Tx 9202-2K
Solvent Free Orange Peel Epoxy Coating

BYK EPOXY TX 9202–2K it is two component, orange peel effect epoxy coating.Its most specific properties are high surface hardness, high chemical and mechanical resistant.
Places of Usage
• Factories, warehouses, shopping malls, aircraft hangars,
• Schools, hospitals, pharmaceutical industry, food industry, laboratories, parking lots,
• Wastewater treatment plants, areas where heavy forklifts and corrosive chemicals are used
Avantajları
• Excellent resistance to chemicals.
• Resistant to friction and abrasion.
• Easy to clean.
• Hygienic, requires no maintenance for a long time.
• Easy to apply.
• Solvent-free

Technical Specifications
Gloss |
Glossy | |
Yoğunluk |
1,55±0,05 gr/cm³ | 20°C TS EN ISO 2811-1 |
Solid Content (%) |
100 By weight | |
Shore D |
75-80 (After 7 days) | |
Diluting |
Not recommended | |
Mixing ratio (A/B) |
19/5 | |
Kullanma Süresi |
30-35 min /23 °C, | 200 g. DIN 16945 |
Sarfiyat |
500-500 g/m2 | |
Curing Time |
Tack Free Time. | 6-8 saat 23°C TS 4317 |
Recoat Time |
24 saat 23°C TS 4317 | |
Full Curing Time |
7 days. 23°C TS 4317 |
NOTE: Flammable and exploision products should be kept away during the application. Protective gloves and masks should be used for hands and eyes during application. The product should be used in well ventilated environments.If the material comes into contact with eyes, it should be washed immediately with su¬cient water. Childrens should kept away from the product. For more detailed information, ask for the Safety Data Sheet (MSDS).
Application Procedures
Karıştırma Oranları
A/B =19/5
Karıştırma
becomes homogeneous. Component B is then added to component A and the mixture is mixed continuously for 2 minutes until it becomes homogeneous. Avoid over-mixing to minimize air entrainment
Application Conditions
Please check the relative humidity and dew point before application. If the conditions are suitable, start the application. Solvent-free epoxy BC is poured onto the primed surface and spread on the surface by a notched trowel. Then, a spiked roller is passed over it to remove the entrained air. The prepared mixture should be consumed within a maximum of 40 minutes. Repair and leveling operations are carried out at least 8 hours after the previously applied epoxy primer
Surface Preparation
For Metal Surfaces: In order to achieve top level performance, sandblasting should be done at Sa 2 ½ level.The sandblasted surface should be primed with a dust rich epoxy primer or phosphate rich epoxy primer to form the required dry film before recording product identification information.
For Concrete Surfaces: The concrete surface must be clean, solid and have sufficient compressive strength (>25N/mm2), and tensile strength must be >1.5N/mm2. The concrete floor to be insulated must be solid and there must be no movement on the surface. The grout layer on the surface must be removed. The concrete to be insulated must be at least C25 and preferably C30 – C35 standard
Concrete Standards: The surface should be cleaned with pressurized water and freed from oil, grease, dirt, mortar particles and dust. Concrete surfaces should be prepared to obtain an open porous surface by removing cement grout using abrasive equipment.
It should also be completely cleaned from mold release agents, cement residues, shavings, loose particles and uncured membranes. The grout layer on the surface must be removed. (Shot-Blast, Rota Tiger etc.) If the surface is too shiny, it should be roughened with milling or sandblasting. Concrete cracks should be cut in a V shape, cleaned and false joints should be cleaned.
Packaging
Sarfiyat
500-500 g/m2
Raf Ömrü
Güvenlik Önlemleri
Responsibility
Yapıştırıcı Grubu çimento esaslı, kayma özelliği azaltılmış, iç ve dış mekânlarda, yatay ve düşeyde kullanılabilen seramik yapıştırma malzemesidir.